Allround Dental Horsham

Allaround Horsham-1 (1) (1)

Allround Dental Horsham

This was a conversion of an old betting shop on a High Street location in Horsham. It was the creation of a new 4-surgery private practice to an exceptionally high standard.
Working alongside Hague Dental (design, cabinetry and equipment) the client had feature mouldings throughout, feature planters and bespoke furniture and dropped ceilings in the reception area. Our works also included the external decorating of the premises, feature doors and specialist lighting throughout.
 
The project was delivered in just over 14 weeks, 2 weeks ahead of schedule.
 

 

Greenwich

Greenwich Project-2 (1)

Greenwich

Conversion of an old showroom within a large residential development in Greenwich. This high end 6 surgery practice was delivered in 18 weeks and included aesthetic suites, staff facilities and OPG facilities.

The project included bespoke metal frame doors, specialist lighting, feature ceilings and a specialist Venetian plaster finish in reception, alongside contemporary wood panelling throughout. Equipment and cabinetry delivered by Clark Dental.

Kentish Smiles Dartford

Kentish Smiles Dartford

Conversion of an empty shell commercial premises underneath a residential block of flats, this was a 16 week build which involved the installation of a new suspended floor and the creation of a new 5 surgery practice, Decontamination Area, Staff Facilities and DDA toilet.

The project provided a logistical challenge with occupied residential flats above the premises and various restrictions in terms of the HVAC requirements of the practice, however the practice was delivered on time and in budget working alongside SPS Dental (equipment and cabinetry).

Gosport

Gosport

Gosport was a unique project for the Dentalbuild team, the conversion of an old pub and hotel into a new 16 surgery dental practice presented many challenges, the listed building had to be completely stripped out, floors lifted and structural changes to ensure we could deliver a fully compliant and DDA accessible practice. In the heart of the community this project was part of a detailed planning application that will see the flats above the premises refurbished as part of the second phase of the build. Dentalbuild also supplied and fitted all the cabinetry to this practice.

This project was delivered by the Dentalbuild team in just 18 weeks from start to finish and project managed by our own fantastic team working alongside architects, the local planning authority and building control.

A new heating system, new flooring and air conditioning throughout the practice has seen quite a transformation to the old building, logistically the challenges on this project were huge, converting an old pub into a brand new dental practice was never going to be easy, but we are proud to say that the project was delivered on time, in budget and Gosport has now been blessed with a fantastic addition to the community which makes fantastic use of what is an impressive building with ample parking and excellent access.

Equipment supplied by Henry Schein UK.

Burgess Hill ‘Neyo Dental’

Burgess Hill 'Neyo Dental'

This new beautiful, modern and sophisticated space was a full refurbishment project. It was a transformation of an old commercial building located in Burgess Hill. Here at Dentalbuild, we have transformed the space into a multi surgery practice. The waiting room creates an inviting space with neutral tones to make a relaxing environment for patients. The high-tech dental surgery rooms follow the same clean style and neutral colour scheme and even have TVs on the ceiling to keep patients entertained during their appointment.
The team at this practice wanted to create an environment “that patients actually enjoyed coming to. They would get amazing specialist dental treatment, the best money could buy.” They wanted their patients experience to be “unique and unlike anything else they have ever experienced in a dental setting.” This criteria is exactly what the team here at Dentalbuild have produced. This project was completed in August 2023.

Family Dental in Crawley

Family Dental in Crawley

This new 7 surgery new build was started in early 2020 and was delivered in just weeks. The empty premises presented many challenges in that the site required floating floors and feature ceilings despite restricted working space, the surgeries all feature LED sky effect ceilings to enhance the look of the practice and maximise the patient experience.

Alongside the 7 surgeries, the practice has 2 offices, 2 staff toilets, a DDA compliant toilet, 2 store rooms, a plant room and a large modern Decontamination Room. The reception is open plan and Dentalbuild supplied a bespoke 3m long reception desk for the client.

The premises also has extensive CCTV throughout and Dentalbuild installed new shopfronts to the front and rear of the premises with a fully automated shutter system to the whole practice.

The client was absolutely delighted with the final finish and praised the Dentalbuild team for their professionalism throughout, they were delighted with the ‘high quality of work’ and ‘outstanding final finish’ Managing director of Dentalbuild, Gareth Davies was proud of his teams efforts. ‘This was a challenging project delivering an outstanding dental practice from an empty shell, the project was delivered on time and within budget, the fact the client is so happy with what we have delivered gives us all a huge sense of pride.’

The new practice opened to the general public at the end of June 2020.

Pallant Orthodontics

Pallant Dental

Pallant Orthodontics Dental in Bognor

Pallant Orthodontics in Bognor was a large project for the Dentalbuild team, a vast premises over two floors which was previously used a charity shop just off Bognor High Street, this project offered many challenges mainly due to the poor state of the building the requirement to reinforce all the first floor timbers and the replacement of the main staircase within the premises to meet with building control requirements.

Working alongside Arcady Designs, a concept was put together which included extensive glass work and a real open plan feel to the practice, the installation of a dumb waiter allowed for best practice in terms of sterilisation and the large upper floor Decontamination Area allowed for excellent access from all of the surgeries.

A fully complaint DDA bathroom was installed to the ground floor along with consolation rooms and a state of the art OPG facility, 2 surgeries on the ground floor were complemented with a further 2 surgeries to the first floor along with staff room, offices and additional waiting area.

The project was turned around in 16 weeks including cabinetry and equipment installation, and despite some further structural issues the project stayed on schedule for the duration of the works. Pallant Orthodontics is now an outstanding practice which has added real value to the seaside town of Bognor Regis. The practice opened in May 2019.