Horsham Gentle Dental

Horsham Gentle Dental was a unique a challenging project delivered in just 12 weeks despite the initial 16 week build allocation.

Located in Horsham High Street, the premises was listed and this in itself presented significant challenges, previously used for health and beauty the premises needed to be stripped out whilst maintaining the original feel to the building, the client wanted 5 working surgeries and working alongside the project architect we managed to deliver 3 surgeries to the first floor and 2 to the upper floors, the practice also has a central decontamination room, staff area and offices and despite the challenges around limited space across the 3 floors we managed to achieve a stunning practice with a really welcoming feel which the clients absolutely love.

Original features including the fireplaces and detailed coving were retained and the external windows were left in place as per the conditions of the build.

Access was difficult on this project and with its pedestrianized high street location , the build presented many logistical hurdles that had to be overcome.

The project was completed on time and within budget with the practice opening its doors in September 2019.

horsham dental clinic

The client couldn’t speak highly enough about the Dentalbuild team and their professionalism during the build ‘Dentalbuild have performed superbly on this project and have been a joy to work with. From the onset they displayed an innovative, economic and pro-active approach to the service required for the project needs of the old building. It was a challenging project which encountered difficult site conditions and environmental restrictions in an austere environment. The innovative solution and flexibility provided in real-time supported us in difficult time. From Managing Director to right through the Site Operatives they have been thoroughly professional in their conduct, which has resulted in a high-quality product to the obvious delight of our patients.